Eave and valley ice barrier
The layer at the eaves and in the valleys, where meltwater and ice collect, laid to the county detail.
Re-roofing in Republic and the Ferry County towns with the ice barrier underlayment the county requires, laid to its detail at the eaves and valleys.
Fastest: call (833) 751-2102. Or send this and we call you back.
Ice barrier underlayment is a self-adhering membrane laid under the covering at the eaves, valleys and penetrations, where meltwater and ice collect. Ferry County requires it, and a roofer lays it to the county detail on every re-roof before the covering goes on.
Ferry County requires ice barrier underlayment, according to the county building applications page recorded in the FACTS sheet. In a county where snow sits on the roof for weeks, the underlayment is the layer that stops meltwater reaching the deck when ice forms at the eave.
The requirement applies to the re-roof, and the roofer confirms the detail for the building before the work starts. The layer is not a substitute for the framing check or for the ventilation of the attic, which are separate parts of the scope.
This page explains where the layer goes, how it is lapped and what the homeowner should see in the file. The county page is the reference for the requirement itself.
Ice and wet underlayment are slippery. Do not walk the eave while the layer is being laid, and let the roofer work with fall protection and the right footwear.
The old covering is removed and the deck is checked for soft or cracked sheets, which are repaired before the underlayment is laid.
The self-adhering membrane is laid along the eaves, extending up the roof the distance the county detail requires, and rolled to bond to the clean deck.
The membrane is continued in each valley and wrapped at each penetration, so meltwater that reaches those points is held by the layer.
The standard underlayment goes over the rest of the roof, lapped to shed water, and the covering goes on over it with the flashing set to the detail.
The record names the ice barrier product, its positions and the date of the work, with photographs of the eave before the covering goes on.
Because meltwater forms on the roof above the warm attic and refreezes at the cold eave, and the ice pushes water back up under the covering.
Snow on a warm roof melts from below, and the water runs down to the eave, where the edge is cold. It freezes there and builds an ice dam, and the water behind the dam is pushed back up under the covering. The ice barrier at the eave holds that water on the deck instead of letting it reach the rafters and the walls.
That is why the layer is laid along the eave first and extended up the roof the distance the detail requires.
Each sheet is laid to overlap the one below so that water runs over the layer and not under it, and the laps are rolled to bond.
Lapping is what makes the layer work. Each course overlaps the one below, so water running down the roof passes over the laps and not under them. The laps are rolled firmly to bond, and the edges are sealed where the product calls for it.
A layer laid with its laps running the wrong way lets water in at each one, so the roofer checks the lapping before the covering goes on.
The product name, the positions of the layer, the date and photographs of the eave before the covering, so a later roofer can see what is under the covering.
A file for a Ferry County re-roof names the ice barrier product, the positions it covers, the date of the work and photographs of the eave before the covering went on. Those four items show a later roofer or an insurer what is beneath the covering.
Keep the file with the roof record and the county reference for the application.
It does not replace ventilation, insulation or the framing check. It is one part of the detail, not the whole of it.
The ice barrier holds meltwater on the deck. It does not stop warm air rising into the attic and melting the snow, so the attic's insulation and ventilation are checked as well. The framing is checked for the snow load. A roofer who sells the layer as the whole answer has not looked at the building.
The county's requirement is for the layer. The rest of the detail is set by the roof and the county's other rules.
The eaves are where meltwater stops, so the layer starts there and runs up the roof.
The ice barrier runs from the eave edge up the roof, usually past the line of the warm wall inside. Its job is to keep water that gets under the shingles from working its way into the house when ice forms at the edge. Starting at the eave and overlapping each course the right way is what makes the layer work in practice.
A layer laid poorly is worse than none, because it traps water on the deck without letting it out. The overlap has to shed toward the eave, the valleys need their own strip, and the nails must be placed where the next course will cover them. Those are the details a county inspector looks for and the details a homeowner should ask about before the crew starts.
Valleys and pipe penetrations are the two places the general layer fails most often.
A valley carries the water from two slopes into one line. Where the ice barrier runs under the valley, it needs its own strip, laid so the water runs down the valley and not across it. A valley with no strip, or with the strip laid the wrong way, is a line of leaks in the first thaw.
Pipes and vents that pass through the roof are cut through the layer and sealed around the flange. The crew checks each penetration for a gap between the barrier and the pipe, because a gap there is the place where meltwater will find the deck first.
The layer has to work with the covering, the drip edge and the vents, not beside them.
The barrier, the drip edge and the covering are one system. A drip edge laid over the barrier at the eave sheds water past the layer, while a drip edge laid under it traps water behind the layer. The order is set so the water always runs out and over, never back under.
Ventilation is checked at the same time. A barrier does not stop warm air from melting snow from below, so the attic vents are checked against the layer to make sure the two work together.
The layer at the eaves and in the valleys, where meltwater and ice collect, laid to the county detail.
Where the roof's shape or the county detail calls for it across the whole deck, the layer is laid over the full area.
The layer wrapped at chimneys, vents and skylights, where water finds the joints first.
The county page recorded in the FACTS sheet names the underlayment requirement, and the roofer confirms the detail for the building.
Re-roofs in Curlew, Malo and the Stevens County towns follow the same county detail where Ferry County rules apply, and the roofer confirms the jurisdiction on the call.
Travel to a rural re-roof is shown on the quote, with the days on site.
Call any hour and explain what is going on. You get a clear price before any work starts.
Not sure if you're covered? Check your ZIP code.
Clearing and preventing ice dams in Republic and Ferry County by fixing the eave, the ice barrier and the warm air leaking into the attic.
Replacing a whole roof in Republic and the Ferry County towns, with the framing checked against the county's roof snow load and the ice barrier laid.
Repairing roofs in Republic and the Ferry County towns that heavy snow has bent, cracked or sagged, checked against the county's roof snow load.
No single price fits a roof in Republic.
Ice barrier underlayment is a layer laid under the covering at the eave and in the valleys, to keep meltwater that gets under the shingles from entering the house.
Whether a re-roof needs a permit depends on the work and on the county rules that apply to it.
Ferry County's building applications page, recorded in the FACTS sheet, requires it. The roofer confirms the detail for the building.
It holds meltwater on the deck at the eave. It does not replace attic insulation and ventilation, which also affect ice dams.
Not safely or reliably on a steep roof. A roofer lays it to the county detail.
The product name the roofer used, with its positions and the date of the work.